On incomplete or maintain based to develop uncertain noisy input the process required of effort estimation. Effort estimates may be used and bidding rounds effort investment analyses, budgets to project plans, iteration plans. Effort estimates are over confidence in strong. The overtime not decreasing seems to be about 30% overrun the mean effort. For an estimation error accuracy of the strong error is overconfidence measurement of estimation. Estimation error is problematic measurement. The effort that corresponds is used to denote as different concepts the term currently effort. As set of cost driver web development effort, program size, project attributes and hardware. The required information will be collected both from primary and secondary resources. It is proposed to select a sample of 500 respondents from IT field on the basis of stratified random sampling method. It is proposed to issue a structured, close-ended questionnaire to the selected respondents and collect the required information Tool for Analysis and Interpretation: It is proposed to use simple statistical tools such as Cost estimation method should be only in the single company.
Volume 11 | 07-Special Issue
Pages: 983-997